4 Bathrooms 1 gas hot water cylinder and 5 happy residence

Its always a great thing to see the happy faces of our costumers once a job is completed successfully. This commercial grade hot water cylinder replacement was not an easy one. Replacing an old gas fired Ruud meant rearranging all the pipework to the other side of the tank. Additionally with the size being 300L, 2 guys had to be on the job.

The flue required modification and a non flammable base including ventilation was also required. Very often older installations don’t comply with current regulation requiring a bit more work to ensure energy savings and of course the safety of the residence.

After a long day the team at hot water cylinders completed the job and hot water was available before dinner time. All went well. All happy 🙂 Of course after this image was taken seismic restrains were added.